Hilton Hotel Extension & Renovation, Nicosia

CLIENT: CYPRUS TOURIST DEVELOPMENT
ARCHITECT: J & A PHILIPPOU
DEVELOPMENT DESCRIPTION: Extension & Renovation of 5*Hotel. The original hotel included 175 double bedrooms with all the necessary communal areas including a ballroom for 500 people. Extension No.1 included the addition of 90 double bedrooms and bungalows around the external swimming pool and upgrading and renovating all the existing communal areas. Extension No.2 included a new wing connected with the existing hotel with a full height atrium which consists of 90 luxurious double bedrooms, suites, business centre, health club with an internal swimming pool and all other facilities.
MEP SERVICES DESCRIPTION:

The commission includes the design and supervision of Electrical Installation services of the project based on the Hilton standards and guidelines.

Electrical Installation Services include Lighting and Power Distribution, HV Metering Facilities, Sub-metering, TV, Satellite & Sound distribution through Television sets, Paging System, Fire Alarm, Security Systems (CCTV, Burglar Alarm, Access Control), Telephone & Structured Cabling (RJ45/Cat.3) installation, External Lighting, Lighting Control with stand-alone Dimming Facility, Low Voltage Infrastructure, UPS for accounting department, Generating Set for selected loads, Lightning Protection of the Faraday’s cage, 2No. Panoramic Lifts 1.6m/s and 1No. Service lift 1m/s all with geared traction machine technology.

Mechanical & Plumbing Installation Services include Central Air Conditioning Systems (Chillers, AHU, FCU), Ventilation System, Plumbing & Drainage, Hot & Cold Water Services, Fire Fighting System, Internal Swimming Pool of the overflow type.

STATUS: COMPLETED
  FINAL
CONSTR. COST: 1. ELECTRICAL INSTALLATION  € 1.600.000,00
  2. MECHANICAL INSTALLATION  € 1.400.000,00
  OVERALL CONSTR. COST OF THE PROJECT € 85 mil.